Background
The construction of a Verona System by the company Petrucco required a series of checks to be carried out during the thrust phase involving the underpass beneath a railway section, implemented without interrupting the traffic. One such check involves continually monitoring track skew. 

The solution Synthesis offered Petrucco a solution that included WineCapTM inclinometer data loggers, to continually check the X and Y axes and send the data to the collection gateway. 

The result The results monitored are displayed on a computer directly on site, for maximum safety control of the railway section. A dedicated web platform was also developed, which can easily be accessed by everyone involved in the operation. In the event of data outside the threshold, the bridge is raised temporarily by a dedicated hydraulic circuit and the correct track geometry is restored.



Attachments


Case Studies
Careggi Hospital in Florence
Cryogenic liquids, typically liquid nitrogen, are used for sensitive...
Molinette Hospital in Turin
With almost 3000 hospital, school and university premises benefiting from its wireless...
Foqus Fondazione Quartieri Spagnoli, Naples
In the setting of the Spanish quarters of Naples, the new EDUQA educational…
Historic Centre of Turin
Calculating heat consumption is crucial for managing corporate and…
Egyptian Museum in Turin
The Egyptian Museum in Turin is the oldest museum in the world...
Porto Marghera
As part of Venice’s urban regeneration RE.MO.VE project...
RFI – Exilles tunnel
Tunnels are an integral part of railway infrastructure...
Val Senales
There were many objectives - measure existing compression on the bridge beams...
Asti – Nizza Monferrato Railway Line
Monferrato Piemontese is an area of Italy that features uplands and…
Metro 5 - Milan
Milan's M5 subway line winds along approximately 25 km of tunnels…
Royal Palace of Caserta
The Royal Palace of Caserta has been a UNESCO heritage site since 1997...
Dubai - Mirdif Hospital
The WineCap™ data loggers for measuring temperature and humidity…
Valsusa
Guaranteeing service continuity for installations in remote areas, where...
Service Stations
The distribution of domestic water in the network of service stations…
Châtillon
The requirement was to monitor a mast (radio base station) positioned on a slope...
Temple of Segesta
This spectacular Doric temple was built in the 5th century BC ...
Lyon-Turin railway tunnel
TELT - Tunnel Euralpin Lyon Turin is the dual-national developer...
Ontario – Canada
he construction of a Verona System by the company Petrucco required…
Monitoring Bearings
A fundamental aspect in the maintenance of large works is checking…
Energy loss
CAPETTI Elettronica has always been mindful of climate change...
Ipo Dam, Norzagaray - Philippines
Ipo Dam is a gravity dam with a concrete water reservoir situated at…
Villa Italia – Lake Como
The work was to renovate and extend a historic building in an extremely…
Alla Scala Opera House
Milan’s La Scala Opera House is one of the most prestigious theatres...
EDEN project
EDEN – Energy Data ENgagement – is a project that transpired from the idea...
Ricci Oddi Art Gallery
In April 2022 the exhibition entitled Klimt - The Man, the Artist, his World...
Sant’Agata de’ Goti
At the beginning of 2019, the Sant’Agata de’ Goti (BN) District Council ...
Grand Paris Express
The main aim of the Grand Paris Express project is to reinforce the Paris...