Background
The Royal Palace of Caserta has been a UNESCO heritage site since 1997, and is one of Italy’s most visited historic sites. Atmospheric pollution and water infiltrations had caused the structure to deteriorate through time, especially the external and internal façades, and this had never been suitably resolved through maintenance operations aimed at achieving appreciable results.
The solution
Major restoration works involving 70,000 sq. m. were finally carried out between 2014 and 2017. During these works it was of primary importance to measure and record numerous physical quantities, such as temperature, wall inclination, the displacement of stone materials and the extent of cracks. Capetti Elettronica’s wireless instrumentation, consisting of WineCap™ control units and dataloggers, was used to ensure maximum precision with minimum visual impact.
The result
The original two-tone colour was restored on the magnificent façade, split between grey travertine at ground level and the ochre of the bricks on the upper level, making it stand out once more to capture the admiration of tourists. Thanks to continuous structural and environmental monitoring, essential waterproofing work was also possible, which will ensure the longevity of this historic majestic site.
The Royal Palace of Caserta has been a UNESCO heritage site since 1997...
The requirement was to monitor a mast (radio base station) positioned on a slope...
As part of Venice’s urban regeneration RE.MO.VE project...
TELT - Tunnel Euralpin Lyon Turin is the dual-national developer...
Ipo Dam is a gravity dam with a concrete water reservoir situated at…
In April 2022 the exhibition entitled Klimt - The Man, the Artist, his World...
Monferrato Piemontese is an area of Italy that features uplands and…
This spectacular Doric temple was built in the 5th century BC ...
In the setting of the Spanish quarters of Naples, the new EDUQA educational…
Tunnels are an integral part of railway infrastructure...
The work was to renovate and extend a historic building in an extremely…
Cryogenic liquids, typically liquid nitrogen, are used for sensitive...
The main aim of the Grand Paris Express project is to reinforce the Paris...
At the beginning of 2019, the Sant’Agata de’ Goti (BN) District Council ...
The WineCap™ data loggers for measuring temperature and humidity…
In the prestigious setting of the Défense Arena, one of the main venues…
The Egyptian Museum in Turin is the oldest museum in the world...
With almost 3000 hospital, school and university premises benefiting from its wireless...
CAPETTI Elettronica has always been mindful of climate change...
In the field of advanced environmental monitoring, the collection of …
Calculating heat consumption is crucial for managing corporate and…
During the cement hydration process, the heat generated by …
The distribution of domestic water in the network of service stations…
Guaranteeing service continuity for installations in remote areas, where...
Milan’s La Scala Opera House is one of the most prestigious theatres...
There were many objectives - measure existing compression on the bridge beams...
EDEN – Energy Data ENgagement – is a project that transpired from the idea...
he construction of a Verona System by the company Petrucco required…
A fundamental aspect in the maintenance of large works is checking…
Milan's M5 subway line winds along approximately 25 km of tunnels…