Background
During the cement hydration process, the heat generated by chemical reactions can induce internal stresses in the concrete, with the risk of thermal shrinkage cracking. To prevent these issues and ensure proper hardening of the material, temperature monitoring becomes a critical factor. In a major industrial expansion project involving the construction of the foundation slab for a new silo and grinding facility, the need arose to monitor the thermal behavior of the concrete, ensuring compliance with design specifications and current regulations.
The solution
The monitoring system installed by Cismondi involves the use of four WineCapTM temperature dataloggers placed at strategic points within the foundation slab, each paired with two IP68-rated platinum resistance temperature detectors (RTDs), installed at different casting depths. The system is completed by a gateway (MWDG) equipped with a box and photovoltaic panel (BOX-PPS), allowing installation in areas without access to mains electricity. The collected data is sent to the Cloud Service, where it can be viewed, downloaded, and managed remotely – providing effective and timely control over concrete conditions.
The result
The monitoring system enabled the tracking of concrete temperature trends during the casting phase and later during setting and hardening. The collected data helped prevent shrinkage and cracking phenomena, improving the overall quality of the structure and ensuring adherence to design parameters.
Monferrato Piemontese is an area of Italy that features uplands and…
Milan’s La Scala Opera House is one of the most prestigious theatres...
At the beginning of 2019, the Sant’Agata de’ Goti (BN) District Council ...
The WineCap™ data loggers for measuring temperature and humidity…
Cryogenic liquids, typically liquid nitrogen, are used for sensitive...
The Egyptian Museum in Turin is the oldest museum in the world...
This spectacular Doric temple was built in the 5th century BC ...
In the prestigious setting of the Défense Arena, one of the main venues…
CAPETTI Elettronica has always been mindful of climate change...
The requirement was to monitor a mast (radio base station) positioned on a slope...
During the cement hydration process, the heat generated by …
In the field of advanced environmental monitoring, the collection of …
TELT - Tunnel Euralpin Lyon Turin is the dual-national developer...
The Royal Palace of Caserta has been a UNESCO heritage site since 1997...
The distribution of domestic water in the network of service stations…
Calculating heat consumption is crucial for managing corporate and…
With almost 3000 hospital, school and university premises benefiting from its wireless...
Tunnels are an integral part of railway infrastructure...
A fundamental aspect in the maintenance of large works is checking…
In the setting of the Spanish quarters of Naples, the new EDUQA educational…
he construction of a Verona System by the company Petrucco required…
As part of Venice’s urban regeneration RE.MO.VE project...
Ipo Dam is a gravity dam with a concrete water reservoir situated at…
EDEN – Energy Data ENgagement – is a project that transpired from the idea...
The main aim of the Grand Paris Express project is to reinforce the Paris...
Guaranteeing service continuity for installations in remote areas, where...
Milan's M5 subway line winds along approximately 25 km of tunnels…
The work was to renovate and extend a historic building in an extremely…
In April 2022 the exhibition entitled Klimt - The Man, the Artist, his World...
There were many objectives - measure existing compression on the bridge beams...