EN
EN IT FR

Case studies

Environmental Monitoring

Champorcher Valley

Champorcher Valley

Background
In the field of advanced environmental monitoring, the collection of pluviometric data is essential for climate analysis, water management and the prevention of extreme events. In many cases, it is necessary to install monitoring stations even in remote areas without access to electrical power or wired connections. 

The solution
The pluviometric monitoring system has been implemented by InGeoLab using Capetti Elettronica’s WineCap™ dataloggers, together with an electronic rain gauge. The integration with the BOX-PPS, equipped with a photovoltaic panel, enables autonomous operation in any environmental condition, even in the absence of grid power. The modular configuration allows the wireless monitoring system to integrate with various sensors for climate monitoring: the IP65 thermo-hygrometric sensor, equipped with a meteorological shield, for temperature and relative humidity measurement; the anemometer for wind speed and direction detection; the solarimeter for measuring solar radiation. 

The result
The implementation of the WineCap™ system ensures continuous and reliable monitoring of environmental parameters, providing real-time data for meteorological studies, water resource management and hydrogeological risk prevention. The wireless solution represents a significant advancement in smart environmental monitoring, with a strong focus on sustainability and technological innovation.



Attachments


Case Studies
Champorcher Valley
In the field of advanced environmental monitoring, the collection of …
Ricci Oddi Art Gallery
In April 2022 the exhibition entitled Klimt - The Man, the Artist, his World...
Foundation slab
During the cement hydration process, the heat generated by …
Metro 5 - Milan
Milan's M5 subway line winds along approximately 25 km of tunnels…
Asti – Nizza Monferrato Railway Line
Monferrato Piemontese is an area of Italy that features uplands and…
Royal Palace of Caserta
The Royal Palace of Caserta has been a UNESCO heritage site since 1997...
Châtillon
The requirement was to monitor a mast (radio base station) positioned on a slope...
Ipo Dam, Norzagaray - Philippines
Ipo Dam is a gravity dam with a concrete water reservoir situated at…
Dubai - Mirdif Hospital
The WineCap™ data loggers for measuring temperature and humidity…
Grand Paris Express
The main aim of the Grand Paris Express project is to reinforce the Paris...
Energy loss
CAPETTI Elettronica has always been mindful of climate change...
Alla Scala Opera House
Milan’s La Scala Opera House is one of the most prestigious theatres...
Foqus Fondazione Quartieri Spagnoli, Naples
In the setting of the Spanish quarters of Naples, the new EDUQA educational…
Villa Italia – Lake Como
The work was to renovate and extend a historic building in an extremely…
Egyptian Museum in Turin
The Egyptian Museum in Turin is the oldest museum in the world...
Val Senales
There were many objectives - measure existing compression on the bridge beams...
Careggi Hospital in Florence
Cryogenic liquids, typically liquid nitrogen, are used for sensitive...
Molinette Hospital in Turin
With almost 3000 hospital, school and university premises benefiting from its wireless...
Service Stations
The distribution of domestic water in the network of service stations…
Lyon-Turin railway tunnel
TELT - Tunnel Euralpin Lyon Turin is the dual-national developer...
Temple of Segesta
This spectacular Doric temple was built in the 5th century BC ...
Monitoring Bearings
A fundamental aspect in the maintenance of large works is checking…
EDEN project
EDEN – Energy Data ENgagement – is a project that transpired from the idea...
Porto Marghera
As part of Venice’s urban regeneration RE.MO.VE project...
RFI – Exilles tunnel
Tunnels are an integral part of railway infrastructure...
Valsusa
Guaranteeing service continuity for installations in remote areas, where...
Environmental Monitoring
In the prestigious setting of the Défense Arena, one of the main venues…
Sant’Agata de’ Goti
At the beginning of 2019, the Sant’Agata de’ Goti (BN) District Council ...
Ontario – Canada
he construction of a Verona System by the company Petrucco required…
Historic Centre of Turin
Calculating heat consumption is crucial for managing corporate and…