Monitoring Buildings

Energy loss

Energy loss

Background

CAPETTI Elettronica has always been mindful of climate change and the need to reduce polluting emissions, and ever since the company was established it has set the market standard when it comes to electronic instrumentation for capturing physical quantities. “You only know what you measure” was a saying by Lord Kelvin and CAPETTI has made it its own, employing this spirit to become a leader in measurements via temperature transducers - wireless dataloggers with Pt1000 sensors and integrated NTC delivering high precision, resolution, repeatability and reliability.

The solution

CAPETTI Elettronica designed the WSD12-TF wireless system to measure the thermal transmittance of the walls, which enables convenient, non-invasive calculation of the conductance using the heat flow meter method. This system is excellent assistance for building energy certification, as it enables the quick and easy measurement of external and internal surface temperatures, correlating them with heat flow linked to the dispersion of the wall itself.

The result

All measurements are recorded on the wireless dataloggers, sent to the WSN control unit and sent to the cloud where, via the WineCap™ Service Centre, the user can view graphs, print reports and export data through transmittance monitoring & analysis (TMA) software made available by Capetti with algorithms developed in collaboration with ENEA - nothing could be simpler!



Attachments


Case Studies
Historic Centre of Turin
Calculating heat consumption is crucial for managing corporate and…
Ricci Oddi Art Gallery
In April 2022 the exhibition entitled Klimt - The Man, the Artist, his World...
Sant’Agata de’ Goti
At the beginning of 2019, the Sant’Agata de’ Goti (BN) District Council ...
Asti – Nizza Monferrato Railway Line
Monferrato Piemontese is an area of Italy that features uplands and…
Egyptian Museum in Turin
The Egyptian Museum in Turin is the oldest museum in the world...
Royal Palace of Caserta
The Royal Palace of Caserta has been a UNESCO heritage site since 1997...
Grand Paris Express
The main aim of the Grand Paris Express project is to reinforce the Paris...
Châtillon
The requirement was to monitor a mast (radio base station) positioned on a slope...
Lyon-Turin railway tunnel
TELT - Tunnel Euralpin Lyon Turin is the dual-national developer...
Porto Marghera
As part of Venice’s urban regeneration RE.MO.VE project...
Alla Scala Opera House
Milan’s La Scala Opera House is one of the most prestigious theatres...
Foqus Fondazione Quartieri Spagnoli, Naples
In the setting of the Spanish quarters of Naples, the new EDUQA educational…
Monitoring Bearings
A fundamental aspect in the maintenance of large works is checking…
Temple of Segesta
This spectacular Doric temple was built in the 5th century BC ...
Ontario – Canada
he construction of a Verona System by the company Petrucco required…
Molinette Hospital in Turin
With almost 3000 hospital, school and university premises benefiting from its wireless...
Ipo Dam, Norzagaray - Philippines
Ipo Dam is a gravity dam with a concrete water reservoir situated at…
Valsusa
Guaranteeing service continuity for installations in remote areas, where...
Metro 5 - Milan
Milan's M5 subway line winds along approximately 25 km of tunnels…
Val Senales
There were many objectives - measure existing compression on the bridge beams...
Service Stations
The distribution of domestic water in the network of service stations…
Villa Italia – Lake Como
The work was to renovate and extend a historic building in an extremely…
Energy loss
CAPETTI Elettronica has always been mindful of climate change...
Dubai - Mirdif Hospital
The WineCap™ data loggers for measuring temperature and humidity…
RFI – Exilles tunnel
Tunnels are an integral part of railway infrastructure...
EDEN project
EDEN – Energy Data ENgagement – is a project that transpired from the idea...
Careggi Hospital in Florence
Cryogenic liquids, typically liquid nitrogen, are used for sensitive...